Monday, October 20

Renovation Progress

Meet up with the INTERIOR designer last Saturday to discuss on the carpentry, cornice and etc.
Although, all wall and floor tiles are done but find there are still tonnes of things to be done before completion. to meet the deadline 11.11.2008.

* Carpentry works
* Cornice
* Installation bathroom items
* Installation Kitchen appliances likes hob, hood and etc
* installation of Windows & Grills and doors
* Electrical & installation of lighthing and fans
* Change of lock
* Painting
* Cleaning up
* Moving, unpacking and packing and etc.

Unhappy with AIRCON piping layout :
As it have make the ceiling between the bedroom very very LOW.
Question => Why can't these AIRCON manufacturer or contractor think of a better ways to hide those UGLY piping. Don't tell me because HDB flat are like that.